US Highway 16CORRIDOR STUDY

The study team is currently conducting a Sub Area Study of U.S. Highway 16 from just east of Rockerville to just west of the Neck Yoke Road intersection.

Public Meeting Open House
Thursday, Dec. 14, 2023
5:30-7 p.m. Mountain Time
Black Hills Energy Event Center (enter through lobby)
7001 Mount Rushmore Road, Rapid City, SD 57701
More Info

About

Planning for the future of South Dakota’s driveway to Mt. Rushmore

The South Dakota Department of Transportation (SDDOT) initiated a study of over 16 miles of U.S. Highway 16 between Cathedral Drive/Fairmont Boulevard in Rapid City and the Keystone Wye to address growing traffic volumes and other challenges throughout the area. The corridor is constantly evolving, whether day to day or year to year. Continued development in the area led to notable increases in traffic that are consistent throughout the year. During the summer the corridor sees a spike in tourism-related traffic that brings motorists unfamiliar with the area and a diverse mix of vehicle types.

This study is a collaborative effort between the SDDOT, FHWA, Rapid City MPO, Rapid City, Pennington County, stakeholders, and the public to develop a comprehensive plan for the corridor. This study will serve as a guide to the SDDOT and other agencies along the corridor for future improvements to address needs well into the future.



STUDY AREA MAP


Study Highlights

South Dakota DOT Federal Highway Administration Rapid City MPO Rapid City, SD Pennington County, SD

Sub-Area Analysis

East of Rockerville to west of Neck Yoke Road

In 2019, the South Dakota Department of Transportation (SDDOT) initiated a study of over 16 miles of U.S. Highway 16 between Cathedral Drive/Fairmont Boulevard in Rapid City and the Keystone Wye to address growing traffic volumes and other transportation needs throughout the area. This study is a collaborative effort between the SDDOT, Federal Highway Administration (FHWA), Rapid City Area Metropolitan Planning Organization (MPO), City of Rapid City, Pennington County, stakeholders, and the public to develop a comprehensive plan for the corridor.

Since the release of the U.S. 16 Corridor Study final report in July 2021, the SDDOT identified a need for further detailed analysis and refinement of alternatives along a U.S. Highway 16 segment from just east of Rockerville to just west of the Neck Yoke Road intersection. Rockerville and Neck Yoke Road intersections are not included in this sub-area.


Sub-Area Map


US 14 Corridor Study Map


Schedule


High-level graphic schedule

Objectives

DEVELOP

  • A long-range plan for the U.S. Highway 16 corridor, which includes the evaluation access:
    • Access
    • Frontage roads and service roads
    • Turn lanes and median crossovers
    • Rockerville area routes
    • Future traffic volumes and route reliability
    • Traffic safety
    • Blowing snow
    • ITS
    • Environmental resources

Determine

  • Recommend a layout at the following intersections to be carried forward into design and future construction:
    • U.S. Highway 16 and U.S. 16/Catron Boulevard
    • U.S. Highway 16 and Neck Yoke Road

Document

  • Create environmental documentation for the U.S. 16/Catron Boulevard and U.S. 16/Neck Yoke Road intersections.

Events

Public Meeting Open House

Date: Thursday, Dec. 14, 2023
Time: 5:30-7 p.m. Mountain Time
Place: Black Hills Energy Lobby Event Center (enter either side of building)
7001 Mount Rushmore Road Rapid City, SD 57701



×

RAPID CITY, SD

Tuesday, December 10, 2019
5:30 p.m. – 7:00 p.m.


Black Hills Energy
7001 Mt Rushmore Road
Lobby Event Center (enter either side of building)

×

BROOKINGS, SD

Thursday, June 27, 2019
5:30 p.m. – 7:00 p.m.


Brookings City and County Government Center
Chambers Room, 310
520 3rd Street
Brookings, SD 57006

Resources

Public Information Meeting #1
(July 23, 2019)

Meeting Summary Study Overview Boards Presentation Slides Informational Handout Traffic Volumes and Operations Boards Travel Survey Crash History Boards Comment Card

Public Meeting #1 Recording:

Public Information Meeting #2
(December 10, 2019)

Meeting Summary Meeting Flyer Presentation Slides Informational Handout Comment Card

U.S. 16/U.S. 16B/Catron Boulevard Intersection Build Options

Build Option 1: Single Point Interchange » View the SPI Animation Build Option 2: Displaced Left-Turn Intersection » View the DLT Animation Preliminary Evaluation Measures

U.S. 16/Neck Yoke Road Intersection Build Options

Build Option 1: Reduced Conflict Intersection (RCI) Build Option 2: Signalized Intersection Preliminary Evaluation Measures

Other Intersection Build Option Boards

Environmental Boards Access Spacing

General Meeting Boards

Schedule and Study Contacts

Preliminary U.S. 16 Corridor Study Concepts

Preliminary Concepts West of Neck Yoke Road

Public Meeting #2 Recording:


Contact

USE THE COMMENT FORM BELOW OR CONTACT PROJECT MANAGEMENT WITH QUESTIONS

Enter an email or phone above if you'd like to be contacted

Steven Gramm, P.E.

SDDOT Project Manager
(605) 773-3281
steve.gramm@state.sd.us

Jon Wiegand

Consultant Project Manager
(605) 782-8105
jonathan.wiegand@hdrinc.com

×

Your message has been sent!